The Preparatory Phase includes conducting detailed feasibility analysis to guide the Circular Pacific project design. It will be delivered in three stages:

  • Project Inception (March to May 2026): In this stage, an Inception Report will be produced detailing the project scope, workplan, methodology, and timeline. A kick-off regional workshop will also take place for participating ADB DMCs.
  • Part 1 – Country Assessments and Enabling Environment (March to September 2026): In this stage, country-specific and regional-level assessments will take place. These assessments will detail the status of solid waste management in each of the 14 ADB DMCs. Findings of these assessments will be presented to stakeholders at an online meeting. Following this, a Regional Consultation Workshop will be held to inform Part 2.
  • Part 2 – Project Design (July 2026 to March 2027): In this stage, detailed plans for the establishment of the Regional Recycling Network, supported by hub facilities and regional agreements, will be developed.

Participating countries includes the engagement of the 14 Pacific ADB Developing Member Countries (DMC): Cook Islands, Federated States of Micronesia, Fiji, Kiribati, Republic of Marshall Islands, Nauru, Niue, Palau, Papua New Guinea, Samoa, Solomon Islands, Tonga, Tuvalu and Vanuatu.

ADB has engaged Tonkin & Taylor International (T+TI) in association with EX Research Institute Ltd (EXRI) to conduct the feasibility analysis and project design.